image description
Building 12 is at the bottom, the middle structure is Building 100, and the top is Building 14.

Pittsfield Historical Commission OKs GE Demos

By Brittany PolitoiBerkshires Staff
Print Story | Email Story

PITTSFIELD, Mass. — The former General Electric campus continues to be chipped away as two more building demolitions are planned next to Site 9.

The Historical Commission on Monday gave the OK for demolition requests for Buildings 12 and 14, located along Tyler Street Extension and the railway. Building 100 sits between the two and is not part of the project.

The environmental abatement and demolition of the buildings will be done by Brandenburg Industrial Service Co. of Bethlehem, Pa. It will remove multiple contaminants and the structures down to the slab and cap the waste consolidation areas.

"To be simple about it, they're ugly," Project Manager Glenn Milarczyk said of the two structures.

The U.S. Environmental Protection Agency approved GE's work plan to demolish the buildings and consolidate debris within the subsurface vaults located in the buildings. Work is expected to begin in the spring.

"The buildings no longer serve any commercial purpose and will be deconstructed," the demolition delay application reads.

The approximately 176,000-square-foot Building 12 was originally constructed in 1914 with additions in 1925 and 1949.

It housed several manufacturing operations throughout the years. GE's Power Transformer Department operated the final assembly, testing, and shipping of large transformers until 1968 and from then to 1986, the department operated a vacuum tank and bushing assembly operations. The building also has a second-floor office.

The building was mainly used for equipment storage in the last decades.



The approximately 278,000-square-foot Building 14 was completed in 1931.

From that time to 1986, it was mainly used for transformer tank assembly and operation of the machine shop that prepared components of transformers and small parts. By 1990 it was primarily used for equipment storage.

Materials including liquids, light bulbs, and asbestos-containing materials will be removed and shipped offsite for disposal.

Commissioner Carol Nichols recognized that this is an "incredible undertaking."

"I certainly appreciated the complexity of the description of what you guys are going to be doing with all the materials," she said.

While these properties are still owned by GE, the abutting parcels have been transformed into the William Stanley Business Park, and Site 9 is on the brink of a dramatic renovation.

After a $9.8 million bid was awarded, work began on the 16-acre parcel at the corner of Woodlawn Avenue and Tyler Street Extension. Once the concrete surface that has been described as "the face of the moon" and a "scar" is remediated, final plans include areas of green space and roadways for traveling within the parcel.

The project was fully funded earlier this year. The last of the funding includes $400,000 of Pittsfield Economic Development Authority foundation funds, $1.3 million in GE landscaping funds, and $4.5 million in American Rescue Plan Act funds.


Tags: demolition,   General Electric,   historical building,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Lanesborough Picks Information Panel for Public Safety Proposal

By Brittany PolitoiBerkshires Staff

LANESBOROUGH, Mass. — The town has a public safety building proposal to present to taxpayers, and now, an informational committee will help move the process forward.

On Monday, the Select Board voted to form a public safety building informational outreach committee and re-appointed four members: Dean Clement, Daniel MacWhinnie, Mark Siegars, and Lisa Dachinger.

"The Public Safety Building Committee has done their job. Now we need, hopefully with some of those same bodies, to form a new committee of some type and move forward," Select Board member Timothy Sorrell explained.

Earlier this month, the town officials voted to advance a $7.3 million combined police/emergency medical services facility to town meeting, discarding the option for a $6.5 million separate build.  The same design, then priced at $5.9 million, was shot down in 2023.

"There is the option to go to what could be a debt exclusion, which requires a two-thirds majority at either a special town meeting or an annual town meeting, and that can be followed by inclusion in a ballot," Town Administrator Gina Dario said.

Siegars advised that if the question goes to a ballot first with a fixed project budget, that amount can't be changed for a subsequent special town meeting vote.

"In our discussions, there are committee members who are willing to stay on if you wanted to continue the committee or appoint to new one, who have volunteered to be involved with any public information sessions to try to answer the questions with the idea that that they would also explore further and work with Gina and town counsel on specifically what the question should be for a special town meeting, and if, if warranted a subsequent ballot vote," he reported.

Chairman Michael Murphy echoed the former committees' arguments that the town can't explore grants and financing until it has approved an amount.

View Full Story

More Pittsfield Stories