The Christopher Columbus bridge has been patched with metal plates over the years.
NORTH ADAMS, Mass. — The bridge on Christopher Columbus Drive has been closed to traffic and the one-way bridge from Western Gateway Heritage State Park will become one lane.
Mayor Jennifer Macksey told the City Council on Tuesday that the bridge to the old Sons of Italy has been closed because it is in "dire repair."
The metal and lumber span over the Hoosic River to State Street has been in rough shape for decades. Former Mayor John Barrett III described it as "deplorable" back in 2003 when the plans were being made for the reconstruction of the Hadley Overpass.
The heavy lumber decking on the bridge has been failing and has been covered with a hodgepodge of metal plates over the years. In March, the mayor reported that the bridge and the vacant Sons of Italy were being evaluated.
It appears on the mayor's draft capital repair list with a price tag of $2.5 million but she said Tuesday that the bridge is privately owned. The structure is apparently owned by the railroad but has operated as an access to Pan Am Railways' buildings; the Sons property, which the Redevelopment Authority purchased in 2011, and Apkin & Sons scrapyard until it closed two years ago.
"The Sons of Italy bridge, that may need to be closed permanently but we haven't been able to get someone out to evaluate it," Macksey said in answer to questions.
The state Department of Transportation recently evaluated the Heritage Park bridge, which allows overflow parking onto the Sons property. It's rated as a 6, or fair, for decking, substructure and superstructure.
The mayor said MassDOT engineers were with Commissioner of Public Services Timothy Lescarbeau on Monday or Tuesday looking the bridge over.
"There's some structural issues there so that is yet to be determined," she said. "Right now we're focused on getting Heritage Bridge patched ... it is safe, it is passable but there are some really big potholes which caused us to really look at the structure of it."
She told the council she would know more when Lescarbeau submits his report.
The 26-foot-long prestressed concrete bridge was built in 1987 and is listed as owned by the state. It is currently one-way from the park to the Sons to allow for overflow parking; motorists would depart over Christopher Columbus Drive, which is no longer possible.
The mayor said the signage would likely be changed to one lane, with drivers being able to go both ways in turn, and another option is to encourage people to use the lot on the other side of the park.
This is justed the latest in bridge woes for the city. The 1952 Brown Street bridge was closed last year and has been in the design phase since 2021. The city is working with state and federal officials on a fix for the Brown Street bridge and the failing Veterans Memorial Bridge is the subject of a planning study using a $750,000 federal grant.
If you would like to contribute information on this article, contact us at info@iberkshires.com.
Your Comments
iBerkshires.com welcomes critical, respectful dialogue. Name-calling, personal attacks, libel, slander or foul language is not allowed. All comments are reviewed before posting and will be deleted or edited as necessary.
No Comments
Clarksburg Has Buyers for Cruisers; OKs Exemption Income Hike
By Tammy DanielsiBerkshires Staff
CLARKSBURG, Mass. — The Select Board will be deciding next week who will get the town's police cruisers.
At Monday's meeting, it also approved changes in the property tax exemptions, including raising the income limit.
The board had voted to dissolve police department in March and rely on the State Police. The two cruisers, including one purchased in 2021, have been taking up space in the garage ever since.
Town Administrator Ronald Boucher on Monday said Adams, Cheshire and Massachusetts College of Liberal Arts had all evinced interest in the vehicles.
MCLA Lt. Mark Denault attended Monday's meeting and said the college was ready to purchase the newer cruiser.
"I'm here to just hear what the board has to say and where they're headed," said Denault. "We're ready now. MCLA is ready. So if we have a purchase-sale agreement tomorrow, we're ready to cut a check tomorrow."
The Adams Finance Committee was reviewing a possible purchase of both vehicles that night. Police Chief F. Scott Kelley had told the Adams Selectmen at a budget workshop in April that the department needed to get on a schedule to update its fleet.
The cuts include a reduction in hours in the school for the dean of students, cutting the tuition to Drury High by a third, imposing tuition for 4-year-olds in prekindergarten and trimming supplies and training.
click for more
Village Pizza owner Christina Nicholas took to Facebook to announce the closure with an emotional goodbye, explaining that medical issues were forcing her hand.
click for more