Flushing of Pittsfield's Water System to Begin

Print Story | Email Story
PITTSFIELD, Mass. — The city of Pittsfield's Department of Public Utilities announces that phase 1 of the flushing of the city's water system will begin Monday, April 22.
 
Water mains throughout the city will be flushed, through hydrants, over the upcoming weeks to remove accumulations of pipeline corrosion products. Mains will be flushed Monday through Friday each week, except holidays, between the hours of 7:30 a.m. and 3 p.m.
 
  • The upcoming flushing for April 22 to May 3 is expected to affect the following areas:
  • Starting at the town line on Dalton Avenue working west through Coltsville including lower Crane Avenue, Meadowview neighborhood, following Cheshire Road north.
  • Hubbard Avenue and Downing Parkway.
  • Starting at the town line on East Street working west through the McIntosh and Parkside neighborhoods.
  • Elm Street neighborhoods west to the intersection of East Street.
  • Starting at the town line on Williams Street, working west including Mountain Drive,
  • Ann Drive, East New Lenox Road, and Holmes Road neighborhoods.
Although flushing may cause localized discolored water and reduced service pressure conditions in and around the immediate area of flushing, appropriate measures will be taken to ensure that proper levels of treatment and disinfections are maintained in the system at all times. If residents experience discolored water, they should let the water run for a short period to clear it prior to use.
 
If discolored water or low-pressure conditions persist, please contact the Water Department at (413) 499-9339.
 
Flushing is an important operating procedure that contributes significantly to the maintenance of the water quality in the water distribution system. 

Tags: hydrants,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Pittsfield Man Sentenced On Multiple Rape, Indecent Assault Charges

PITTSFIELD, Mass. — On Wednesday, May 15 Douglas Agyeh, age 44 ofPittsfield, pleaded guilty to 23 charges. 
 
Agyeh pleaded guilty to:
  • 5 counts of Indecent Assault and Battery on a Person Over 14
  • 9 counts of Rape of a Child with Force
  • 9 counts of Rape of a Child, Aggravated by Age
The Defendant was sentenced to 10 to 12 years for the charges of rape and 3 to 5 years concurrent for the charges of indecent assault and battery. The Defendant will serve his sentence in state prison.
 
According to a report, in 2021 Agyeh was employed at a residential school for youth. Over a period of several weeks Agyeh was responsible for monitoring a student's safety as they (singular) slept.  During this time, he raped the student. In a separate incident, Agyeh was also found guilty of sexually assaulting a student under the guise of helping the student fold their (singular) laundry.
 
The Defendant was originally set to stand trial on January 30, 2023 but fled to Canada in attempt to avoid justice. The Defendant was arrested as he entered Canda. The Berkshire District Attorney's Office worked closely with the United States Department of Justice and Canadian authorities to successfully extradite the Defendant back to Massachusetts. Authorities allege the Defendant was traveling to Canda in an attempt to return to Ghana, Agyeh's native country.
 
The Great Barrington Police Department served as the lead law enforcement agency in the case. The Department of Justice and Canadian law enforcement agencies assisted the Berkshire District Attorney's Office, including the State Police Detective Unit, in the extradition of the Defendant.
 
Assistant District Attorney Andrew Giarolo represented the Commonwealth. Kristen Rapkowicz served as a victim witness advocate on behalf of the Berkshire District Attorney's Office. Berkshire County Kids' Place and Violence Prevention Center played a central role in the investigation. Emily Zoltan was the Multidisciplinary Team Leader in coordinating the law enforcement response.
View Full Story

More Pittsfield Stories